Product Details:
Payment & Shipping Terms:
|
Material: | All Kinds Of High Strength Steel | Lifting Load: | 1-15T |
---|---|---|---|
Driven Type: | Hyraulic And Electric | Grooving Type: | Spiral Or LBS |
Application: | Tower Crane Winch,construction Crane And Mining Industry Etc | Model: | LBS-S-DN(xxx)-D(xxx)-L(xxx) |
Customization: | Yes | Color: | Yellow Or Red Or As Your Require |
High Light: | tower hoist winch,light duty electric winch |
Title:Split Type LBS Grooved Sleeves with Different Material Like Carbon Steel and Stainless Steel
2.Product details
When you are facing the problem that the winch drum can't meet your requirements. it appears bite or mess problem or its rope capacity can't meet your need or you want to make wire rope spool more layers,Then you can choose to change the winch drum.
First, the techinical parameters related to the design and processing of the drum:(the LBS system includes the whole drum and the split sleeve)
Drum diameter:
Width between flanges:
Diameter of wire rope or cable:
The direction of entry of the wire rope (spinning direction): left and right
Material and requirements of the reel:
The diameter of the flange:
The maximum working load of the wire rope:
The maximum capacity of the wire rope:
Angle of position of the reel and the fixed pulley:
The way of entering the rope is through a flange or a reel:
Note:the LBS sleeves need the diameter, outer diameter,wire rope structure, rope groove rotation(left or right)and other parameter of the drum.
2.Similar products:
If you don't want to replace the whole drum, you can choose the split type LBS groove sleeves, which can directly install on the smooth drum. This is a cost effective method.
Why you shoud choose us:
1)10 years LBS design and produce experience
2)LBS patent award by government
3)The specilized in design and drawing for one of the customer according the different usage
4)The successful case with China big government project
5) Top quality with competitive price.
LBS Products Drum Feature:
FAQ:
Q1:What's your terms of payment? A. T/T 50% deposit and 50% before delivery. we will show you the photos of products and packages before your pay the balance. |
Q2:What's your terms of delivery? A. EXW, FOB CIF CFR etc
|
Q3:How about your delivery time? A. Generally,it will take about 10-30 days after receive your advance payment.The specfit delivery time depends on your order.quantitty. |
Q4:Can you produce according to the samples? A. Yes, we can produce by your sample and technical drawings, we can build mold and fixtures.
|
Q5: What's your sample policy? A. We can supply sample, but the customer have to pay the sample cost and courier cost.
|
Q6: Do you test all your goods before delivery? A. Yes, we have 100% test before delivery.
|
Contact Person: Marie
Tel: +86 13315131859